River road urban upgrade

Completed.

River Road Ubran Upgrade Plan
River Road upgrade basecourse

Project Discription

River Road is an arterial of importance in the north-east of the city and is a key feeder to Hamilton's arterial ring road system. Council is in the process of finalising the plans for the upgrade of River Road from Sylvester Road to Te Huia Drive to urban standards.

Consultation was carried out on the form and function of the corridor through the designation process in 2005. Since then Council has successfully worked with property owners and developers to purchase the land required for the project.

The upgrade of this section of River Road to urban standards will provide for vehicle traffic, public transport, cycling and walking facilities, and a more attractive environment.

The urban upgrade involves:

  • Widened road carriageway
  • Provision of parking at key locations through new indented parking bays and future bus bays along the road (see upgrade feature icons on map)
  • To accommodate for safe on road cycle lanes on street parking will only be available in indented parking bays – from the Discovery Drive roundabout to Te Huia Drive – (see upgrade feature icons on map)
  • Installation of kerb and channel
  • New concrete footpaths linking to the existing footpaths on River Road
  • A short off road shared walking/cycle path linking the Discovery Drive Underpass to the new River Road on road cycle lane (see map insert)
  • Pedestrian refuge islands at key locations to improve pedestrian safety across the road
  • Tactile pads to be installed to assist visually impaired pedestrians at the crossing points
  • Final road surfacing will be reinstated in chipseal and a central painted flush median to enable safer right turns for vehicles at intersections and into properties (see upgrade feature icons on map)
  • Installation of street lighting. The existing overhead power lines are proposed to be undergrounded (from 200m north of Sylvester Road to Te Huia Drive) in partnership with WEL Networks.
River Rd stormwater outflow

Hamilton is continuing to grow – particularly in the north – as is the amount of traffic on our roads. Projections show that this will be the trend for the foreseeable future. Council is doing much to address this traffic growth to enable good access and movement around the city for all modes of transport and to ensure the city's transport network can be sustainable for the future.

Time period

The contract is expected to be completed during the 2009/10 summer. The contractor is proposing to finish sections of road as they go so that only a minimum of unsealed road surface is exposed at any time. Planning for the project has been done to achieve the maximum progress while keeping resident inconvenience to a minimum.

Contractor

  • Schick Construction and Cartage Limited

Plans

The indicative plan gives a visual indication of the anticipated work to be undertaken. Work is likely to start late in 2008, subject to finalising the design and resource consents.

Links

Contact


 
 
 


 


 
 
 
 
 
 

Return to main page

Specific enquiries about the contractor's activities

Schick Construction & Cartage Ltd
Phone: 849 3111 or 027 449 3012

General enquiries about this project

Transportation Unit
Level 5, Council Offices
Garden Place
Hamilton City Council
Private Bag 3010
Hamilton 3240
Phone: 838 6868
Fax: 838 6440