| Wastewater Disconnection & Sealing Fees |
|
1 July 2011 - 30 Sept 2011 |
|
1 Oct 2011 - 30 June 2012 |
| Audit |
|
$84.00 |
|
|
| Disconnection |
|
$690.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
| 100mm Diameter Connections |
|
|
|
|
| Stormwater and Wastewater on Private Property |
|
|
|
|
| a) Main already exposed |
|
$887.00 |
|
|
| b) 0-2m deep |
|
|
|
|
| Establishment fee (lump sum) |
|
$990.00 |
|
|
| plus cost per metre length of connection |
|
$162.00 |
|
|
| c) 2-4m deep |
|
|
|
|
| Establishment fee (lump sum) |
|
$990.00 |
|
|
| plus cost per metre length of connection |
|
$250.00 |
|
|
|
|
|
|
|
| 100mm Diameter Connections |
|
|
|
|
| Stormwater and Wastewater in the Carriageway |
|
|
|
|
| a) 0-2m deep |
|
|
|
|
| Establishment fee (lump sum) |
|
$1,345.00 |
|
|
| plus cost per metre length of connection |
|
$240.00 |
|
|
| b) 2-4m deep |
|
|
|
|
| Establishment fee (lump sum) |
|
$1,345.00 |
|
|
| plus cost per metre length of connection |
|
$360.00 |
|
|
|
|
|
|
|
150mm Diameter Connections
|
|
|
|
|
| Stormwater and Wastewater on Private Property |
|
|
|
|
a) Mail already exposed
|
|
$985.00
|
|
|
b) 0-2m deep
|
|
f |
|
|
Establishment fee (lump sum)
|
|
$1,100.00
|
|
|
plus cost per metre length of connection
|
|
$247.00
|
|
|
c) 2-4m deep
|
|
|
|
|
Establishment fee (lump sum)
|
|
$1,100.00
|
|
|
plus cost per metre length of connection
|
|
$247.00
|
|
|
|
|
|
|
|
150mm Diameter Connections
|
|
|
|
|
Stormwater and Wastewater in the Carriageway
|
|
|
|
|
a) 0-2m deep
|
|
|
|
|
Establishment fee (lump sum)
|
|
$1,171.00
|
|
|
plus cost per metre length of connection
|
|
$347.00
|
|
|
b) 2-4m deep
|
|
|
|
|
Establishment fee (lump sum)
|
|
$1,179.00
|
|
|
plus cost per metre length of connection |
|
$347.00
$985.00
|
|
|
|
|
|
|
|
Stormwater Bubble Up Connections
|
|
$2,215.00
|
|
|
|
|
|
|
|
Catchpit connections
|
|
|
|
|
a) 300 diameter
|
|
$4,200.00
|
|
|
b) full size catchpit for 2 or more properties
|
|
$5,400.00
|
|
|
|
|
|
|
|
| Larger Diameter Connections (>150mm) |
|
Quote |
|
|
|
|
|
|
|
| Manhole Installation Required |
|
Quote
$985.00
$985.00
$985.00
$985.00$985.00
$985.00
|
|
|
|
|
|
|
|
| Closed Circuit TV Inspection |
fixed fee |
$375.00 |
|
|
|
|
|
|
|
| On site pipe location |
|
$260.00 |
|
|
|
|
|
|
|
| Stormwater Pipes to Kerb and Channel (domestic only) |
|
|
|
|
| 1 pipe in trench $/m |
$/m |
$141.00 |
|
|
|
|
|
|
|
| Consent to Enter |
|
|
|
|
| Basic processing of consent to enter |
|
$235.00 |
|
|
|
|
|
|
|
| Work effort required beyond initial written request to |
per hour |
$95.00 |
|
|
| affected parties, charged for on a time cost recovery basis |
|
|
|
|
|
|
|
|
|
| Trade Waste |
|
|
|
|
| Trade waste application fee - permitted application |
|
$142.00 |
|
|
| Trade waste application fee - consented application |
|
$265.00 |
|
|
|
|
|
|
|
The consented application fee covers a maximum of 5 hours
|
|
|
|
|
of staff time, any applications which require additional staff
|
|
|
|
|
| time will be charged on at an hourly basis |
|
|
|
|
|
|
|
|
|
Trade waste consented application fee
|
hourly rate |
$75.00 |
|
|
|
|
|
|
|
| Temporary discharge consent application fee |
|
$142.00 |
|
|
| Inspection fee |
|
$158.00 |
|
|
| Annual audit fee (for permitted discharges with pre-treatment devices) |
$142.00 |
|
|
| Quantity charge rates |
|
|
|
|
| a) 24 hour flow volume charge rate |
$/m3 |
$1.03 |
|
|
| b) Suspended solids charge rate |
$/kg |
$0.63 |
|
|
| c) Organic loading (BOD) charge rate |
$/kg |
$0.90 |
|
|
| Trade waste annual conditional consent charge |
annual fee |
$905.00 |
|
|
|
|
|
|
|
| Sale of Standard Requirements and Bylaws |
|
|
|
|
| Trade Waste Bylaw |
|
$10.60 |
|
|
|
|
|
|
|
| Wastewater and Water |
|
|
|
|
| Application fee for contractor to apply for WWS |
|
|
|
|
| approval to connect to HCC in-service pipelines |
|
|
|
|
| minimum fee |
|
$316.00 |
|
|
| plus re-inspection |
|
$70.00 |
|
|
| or less $200 refund if application refused |
|
|
|
|